English | العربي
Sitra Power & Desalination Plant Extension
Description: 35.4 MW ISO rating gas turbine & 5/6 MIGPD desalination. plant, one Waste Heat Recovery Boiler of 80 ton/hr and one dual firing aux. boiler of 160 ton/hr. Seawater intake of 15000m3/hr complete with settling basin, chemical treatment and hypochlorination plant.
Start Date: 1981
Complation Date: 1985
Cost: 55 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved