Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Madinaty Irrigation Networks |
Automatic Irrigation Networks for different areas in Madinaty |
2010 |
2010 |
0.2 |
Technical & Financial Evaluation |
Arab Company for Projects and Urban Development |
Egypt |
|
Wastewater Tratments Plant in Madinaty |
Sewage Water Treatment Plant with Capacity 160,000 M3/day in two phases & Reuse for Irrigation, Biogas & Power Production, Mixing with Solid waste for Sludge treatment for fertilizers in 2/3 phases. |
2011 |
2015 |
80 |
Technical & Financial Evaluation of the Process and all components, Review of the preliminary hydraulic Calculation, prequalification of bidders, O&M Offer Review, Evaluation Report. |
Arab Company for Projects and Urban Development |
Egypt |
|
upgrading of al yossr desalination plant to produce 80000 m3/day |
Sea Water Desalination Plant With Capacity 40000 M3/Day, Sea Water Intake Including 6x630mm Suction Pipelines, Product Water Storage Tank With Capacity 20000 M3, Pumping Station And Service Building, 8x5000 M3/Day(Ah 5x8000 M3/Day)Ro Units & 3x630 Mm Reject Pipelines |
2012 |
2018 |
111 |
Project Management, Review Concept Design & Tender Document, Bid Evaluation, Assistance to Prepare Contract, Design Review, Construction Management & Supervision, Guarantee Supervision |
National Organization for Potable Water and Sanitary Drainage(NOPWASD) |
Egypt |
|
Consultancy Services For Upgrading Of Mina Pump Station At Sila. Under Ltra Frameworks Consultancy Contract No. D-10503/A-2 |
Construction of New Water Pumping Station and Related Structure. Construction of Water Storage Reservoirs. Supply And Installation Of New Pumps, Valves, Fittings, Meters,Etc.. |
2012 |
2018 |
0 |
Preliminary and Detailed Design, Tendering Services, Construction Management & Supervision, Guarantee Supervision |
Abu Dhabi Distribution Company |
0 |
No Image
|
Construction of Desalination Plant of 10000 M3/D in Madinaty |
Extension To P No. 24089 Well Water Reverse Osmosis Plant Of Capacity 10,000m3/D Plant, Single Pass And Three Trains And Recovery Ratio Of 70%, Pretreatment System Suitable For Bore Well Plant Including 5 Multi Media Filters (Mmf),Post Treatment System To Permeate, Concrete Product Water Tank With 5000m3 Capacity Concrete Raw Water Tank Of 1200m3 Capacity (Optional) |
2012 |
2016 |
9 |
Construction Management & Supervision, Bid Evaluation, Detailed Design, Project Management |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Consultancy Services For Water Supply To Different Locations In Madinat Zayed, Ghayathi And Delma Island, Under Ltra Frameworks Consultancy Contract No. D-10503/A-6 |
Water Supply to Different Locations in Madinat Zayed, Ghayathi and Delma Island |
2012 |
2016 |
6.6 |
Preliminary and Detailed Design, Tendering Services, Site Supervision, Guarantee Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
No Image
|
El-Ameria new gas turbine power plant 3X63 MW ISO rating |
Interconnection with The 220kv Network Through The 220/66/11kv - 2x125mva S/S Consists of Three Gas Turbine 33mw Site Rating, 220kv Gis Switchgear, 66kv Ais Indoor Switchgear Both Double Bus Bar One Breaker Scheme and Two Main 125 Mva, 220/66/11 Kv Transformers |
2012 |
2015 |
167 |
Feasibility Study, Study Report, Concept Design, Prequalification of Contractors, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Attending Manufactures Tests, Commissioning, Guarantee Supervision |
Egyptian Petrochemicals Co. |
Egypt |
No Image
|
consultancy service for well drilling |
Construction Site Supervision Drilling And Maintenance Of Water Wells And Installation Of Casing And Screen To The Full Completed Depth In The Eastern & Western Region |
2012 |
2015 |
123 |
Study Report, Concept Design, Review of Current Specification, Construction Management & Supervision, Design Review, Guarantee Supervision, |
Abu Dhabi Food Control Authority |
United Arab Emirates UAE |
|
Consultancy services for design and construction supervision services for upgrading al khuwair south-03 primary substation from 2x20 mva to 3x20 mva |
Design And Construction Supervision Services For Upgrading Al Khuwair South-03 Primary Substation From 2x20 Mva To 3x20 Mva |
2012 |
2014 |
10 |
Basic Design,Tender Document,Soil Investigation,Detailed Design,Bid Evaluation,Assistance to Prepare Contract,Construction Management & Supervision
|
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02 |
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02. The Anticipated Quantity of Pipelines to Be Replaced Is Approximately 39km with All Associated Civil Works |
2013 |
2018 |
16 |
Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Number of projects: 279
|