English | العربي
Manazel : Al Reef Down Town Infrastructure
Description: Corridors / Reservations for Down Town Infrastructure Package for Water & Fire Fighting, Sewage, Storm Water, Electrical, Telecom, Roads and Irrigation Networks and Traffic Management Study & Parking Requirments for Roads Networks
Start Date: 2009
Complation Date: 2011
Cost: 50 million US $
Services Provided: Master Plan, Study Report, Concept Design, Detailed Design
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved