English | العربي
water distribution networks for 200MM CS Jabel Hafeet Pipeline
Description: Laying Approximately 10.5 Km Of 1xdn 200mm Cs Grade 60 Transmission Pipeline Including Surge Analysis Study Of The Pumping Systems From Jabel Hafeet Base Pumping Station To Summit Pumping Station, Laying Suitably Sized, Secured Supply Pipeline Around 3 Km Of 150mm Cs From Summit Reservoir To Feed The Hh Presidents Palace With Provision For Hotel And Cafeteria And Future Tap-Off, Laying Of Fiber Optic Cable Between Base And Summit Pumping Station.
Start Date: 2009
Complation Date: 2016
Cost: 25 million US $
Services Provided: Project Management, Concept Design, Detailed Design, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved