Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
PSG and Buggy Floor capacity increase |
Built up and extension to the new buggy floor from W to E by 18m and from S to N by 45m for 3 floors including the drawing system |
2003 |
2003 |
2.2 |
Structural design for the building extension . Produce the details execution steel drawings, specifications and Tender Documents:
- Structural calculations for the New Extension and check the stability of the existing TCI building.
- Producing all the detailed engineering & concrete raft foundation Drawings and structure steel detailed drawing.
-Production of the Tender Documents and Technical Specification.
|
Proctor & Gamble |
Egypt |
|
Supply & Installation of 10 R.O. Desalination Units at Forest Area |
Supply & Installation of 10 R.O. Desalination Units at Forest Area |
2003 |
2003 |
0.66 |
Post-contract duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Replacing High Capacity Water Chillers at Umm Al-Nar Plant |
Replacing high capacity water chillers as follows: 6 x 1030,000 kcal/hr centrifugal sea water cooled water chillers working with R 134a refrigerant, complete with chilled water pumps & piping. 2x126.72 kW air-cooled water chillers complete with chilled water pumps and piping. 3x141.9 kW air cooled water chillers complete with chilled water pumps and piping. 2x102kW split air conditioning units. |
1998 |
2003 |
3.5 |
Preparation of tender document’s, bids evaluation, site supervision including commissioning and guarantee period. |
Water & Electricity Department |
United Arab Emirates UAE |
|
Extension of Sur RO Desalination Plant |
Extension of Sur RO Desalination plant consist of, 1MIGD RO desalination plant, 3MW diesel generator, 250 m3 fuel oil storage tank, 4 beach wells, 4 pumps, All associated electro-mechanical works, All associated civil works |
2001 |
2003 |
9 |
Preparation of Design Report & Tender Documents evaluation, site supervision including guarantee period |
Ministry of Electricity and water, sultanate of Oman |
Sultanate Of Oman |
|
Al Kamil Power Plant |
3x123MW ISO GE frame 9E gas turbines, 2x600m3 fuel oil tanks, All associated electro-mechanical works, All associated civil works, The project is BOO Basis. |
2001 |
2003 |
120 |
Detailed Design for Mechanical, Civil, Electrical, I&C, Gas turbine foundation design and interfaces, Sub-vendor and subcontractor nomination and evaluation, Amendments due to site changes, troubleshooting during construction. |
Al-Kamil Power Company |
Sultanate Of Oman |
|
Lift and Hoist Shaft tower (+30.50) Floor Extension |
Built up hoist shaft tower of 40m light and extension for the floor at El (+30.50) |
2004 |
2004 |
1.3 |
Structural design for the lift and Hoist Shaft tower, check for the stability of the existing TCI building, produce the details execution steel drawings specifications and Tender Documents:
- Structural calculations for the lift and Hoist Shaft tower and its connection with the New Mixing Building
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
Pumping Stations for fodder farm in Wadi Al-Ryum |
Construction of the three new pumping stations from three reservoirs of well water to remote reservoirs feeding the fodder farm as follows:4x310m3/hr at 49m,4x300m3/hr at 21m,4x250m3/hr at 15m
|
2000 |
2004 |
3.9 |
Preparation of Design Report, Tender Documents, Bids evaluation, post contract duties including supervision of construction and commissioning |
Abu Dhabi Municipality UAE |
United Arab Emirates UAE |
|
Relocation of Desalination Units from Mirfa to Dalma |
Relocation of 2x1 MIGD TVC desalination units from Mirfa to Dalma |
2003 |
2005 |
15 |
Preparation of Tender Documents, Bids Evaluation, site supervision including guarantee period. |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Chlorination System & Associated Works in the Sharqiya Region |
Water Sterilization – Dis-infection by using Chlorine Dioxide in a Sharqiya Region for 20 water wells at 8 different location |
2004 |
2005 |
1.5 |
Design review & site supervision |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba |
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba – Abu Dhabi Emirate including construction, commissioning and guarantee of 2 pumping stations (3 x 135 m3 /hr) each and rehabilitation of one similar existing pumping station. |
2003 |
2005 |
1.9 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Number of projects: 279
|