English | العربي
Assuit West Cc Power Plant – Waste Water Study Problem
Description: Assuit West Cc Power Plant 8x125 Mw Gt + 4hrsg+ 2x250 Mw St Troubleshooting And Root Cause Analysis To Enable Restart Of Operation Including Environmental Permit Requirements
Start Date: 2019
Complation Date: 2020
Cost: 1500 million US $
Services Provided: Study Of Injection Of Water In Gas Turbine To Improve Flue Gas Quality, Studying Salinity Values Of Well Water (Current Source Establish Whether Brine Recirculation Occurs When Discharged To The Ground, Studying Of Maximizing The Use Of Waste Water To The Discharge To Nile Canal Within Acceptance Limits To Environment, Suitability Of Ponds As Waste Water Drain And Evaporation Limits, Reducing Un Wanted Discharge Pollutants
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved