NEW ASSUIT COMBINED CYCLE ENGINEERING WORKS FOR WASTE WATER DISCHARGE
Description: ENGINEERING WORKS FOR WASTEWATER DISCHARGE INCLUDING BLOWDOWN PUMPS/ PIPING RO PROJECTS, BRINE PIPING DEEP WELL PUMPS, RECHARGE, PUMPS, PROTECTION WORKS AND CIVIL ENGINEERING PIPING WORKS
Start Date: 2019
Complation Date: 2020
Cost: 1500 million US $
Services Provided: 1-DATA VERIFICATION AND REVIEW 2-DEVIEW OF PUMPS/ PIPING WITH CALCULATION OF THE HYDRAULIC GRADIENT AND RECOMMENDATION 3-DESIGN OF PUMPS CONCRETE PEDESTAL AND STEEL BASEPLATE & ANCHORING BOLTS. 4-ENGINEERING OF I&C WORKS INCLUDING P&ID REQUIRED FOR WASTE WATER AND DEEP WELL DISCHARGE TO MIXING POND, MIXED WASTEWATER TO RECHARGING WELLS AND THEIR CORRESPODING CONTROL