NEW ASSUIT COMBINED CYCLE ENGINEERING WORKS FOR WASTE WATER DISCHARGE |
|
Description: |
ENGINEERING WORKS FOR
WASTEWATER DISCHARGE
INCLUDING BLOWDOWN PUMPS/
PIPING RO PROJECTS, BRINE
PIPING DEEP WELL PUMPS,
RECHARGE, PUMPS, PROTECTION
WORKS AND CIVIL ENGINEERING
PIPING WORKS |
Start Date: |
2019 |
Complation Date: |
2020 |
Cost: |
1500 million US $ |
Services Provided: |
1-DATA VERIFICATION AND
REVIEW
2-DEVIEW OF PUMPS/ PIPING
WITH CALCULATION OF THE
HYDRAULIC GRADIENT AND
RECOMMENDATION
3-DESIGN OF PUMPS CONCRETE
PEDESTAL AND STEEL
BASEPLATE & ANCHORING BOLTS.
4-ENGINEERING OF I&C WORKS
INCLUDING P&ID REQUIRED FOR
WASTE WATER AND DEEP WELL
DISCHARGE TO MIXING POND,
MIXED WASTEWATER TO
RECHARGING WELLS AND THEIR
CORRESPODING CONTROL |
|
|