Supply, Installation & Maintenance of 5 Nos. Reverse Osmosis Plants of 10,000 IG capacity in Western Region |
5 Nos. R.O. Plants in Wadi Al Ryum Station No. 7, Bainoona Camp, Wadi Al Ryum Camp No.1, Ghayathi Camp, and Bida Al Salam – Western Region of Abu Dhabi Emirate. |
2003 |
2006 |
1.35 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Lift and Hoist Shaft tower (+30.50) Floor Extension |
Built up hoist shaft tower of 40m light and extension for the floor at El (+30.50) |
2004 |
2004 |
1.3 |
Structural design for the lift and Hoist Shaft tower, check for the stability of the existing TCI building, produce the details execution steel drawings specifications and Tender Documents:
- Structural calculations for the lift and Hoist Shaft tower and its connection with the New Mixing Building
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
Garden lights in Festival Area of Breakwater |
Installation of 258 Nos. decorative lighting poles with 3 lanterns, and 5 Nos. poles with 5 lanterns and 2 clock poles |
1998 |
1999 |
1.24 |
Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
The University City Hospital, Baghdad (Phase One) |
Electro-mechanical works for 1000 Bed Hospital |
1969 |
1970 |
1.2 |
Design and Preparation of Construction Drawings for Electrical Contractor, M/s. WETCO Baghdad |
M/s. WETCO Baghdad |
Iraq |
|
Al Ain Power Station Extension Phase II |
1 x 3.75 MW Diesel Power Station running on crude oil |
1972 |
1974 |
1.2 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Design of Training Center and Mosque at P&G s New Plant |
Prepare and Carrying Out the Construction Design Package Design Calculation, Detailed Drawings, Bill of Quantities and Specifications For The Landscaping and Layout of the External Works and All Architectural Design |
2014 |
2015 |
1.2 |
Detailed Design, Topographical Survey |
PROCTER and GAMBLE |
Egypt |
No Image
|
Hurgada and Sharm El-Sheikh Power and Desalination Plants (see II) |
Two plants at Hurgada and Sharm El-Sheikh each comprising of:2 x 250 m3/day Reverse Osmosis desalination units (originally designed as vapour compression) |
1991 |
1996 |
1.05 |
Optimization study, Engineering Design preparation of Tender Documents, Bids evaluation, post contract duties. |
Abu Dhabi Tourist Investment Company |
Egypt |
|
Old Bar Soap Building Demolition |
Demolition of the existing bar soap building and making the necessary calculation checking for the stability and strengthening of the existing packing building before the demolition. |
2000 |
2000 |
1 |
Production of the Tender Documents, stability calculations and execution drawings (demolishing and strengthening of the steel structure) |
Proctor & Gamble 6th of October Cairo- Egypt |
Egypt |
|
Light Industries Plant |
Plant for manufacturing light products: bags, socks, and other light products |
1990 |
1991 |
1 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation and Supervision of Construction |
Egypt Light Industries Co., |
Egypt |
|
RO Desalination Plant, Sharm El-Sheikh |
2x250 m3/day RO Desalination Plant Complete with Beach Wells, Auxiliaries and Ancillaries. |
1997 |
2001 |
1 |
Preparation of tender documents, bids evaluation and post contract duties |
NESCO - Misr for Tourism Investments, Cairo, Egypt. |
Egypt |
|
Number of projects: 279
|