Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
SWRO Plant of 1000 M3/D for Reef Oasis |
SWRO Plant of 1000 M3/D for Reef Oasis |
2018 |
2019 |
2 |
Project Management, Tender Document, Evaluation Report, Site Visit |
Global for Tourism Development |
Egypt |
|
Zohr Development Project |
Supervision and Coordination Site Staff |
2018 |
2018 |
2 |
Commissioning, Evaluation Report, Technical Report, Inspection And Site Visits ,Analyzing Received Evaluation ,Preparing Technical And Financial Reports Including Recommendation ,Check Compliance With Egyptian Standard ,Check The Function To Monitor And Control If Consumption ,Testing, Commissioning Till The Taking Over Of Project ,Review Technical Data Sheet, Checking Availability To Integrate With Exiting Meters ,Preparing Recommendation Report. |
SAPESCO |
Egypt |
No Image
|
Additional RO Unit Utilizing the Brine of the Existing Plant in Madinaty |
Technical Study Report for Brine of Ro Plant In Madinaty |
2016 |
2018 |
2 |
Study Report |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Zohr Development Project |
Steam Blowing Scope Of Zohr Development Project Is Gas Producing Plant, Including Review Of Subcontractor Preparation Submittals Ready For Contract Time Schedule, Technical Drawing, Calculation Of Different Lengths And Pipes And Review Pipes Support, Review Of Design Work, Site Supervision And Review Subcontractor During Execution Of Steam Blowing At Site |
2018 |
2018 |
2 |
Technical Report, Tender Document, Bid Evaluation, Prequalification Of Contractors, Assistance To Prepare Contract, Construction Management & Supervision, Design Review, Design Report, Advisory Activity, Attending Manufactures Tests, Basic Design, Commissioning, Guarantee Supervision, Evaluation Report, Site Supervision |
SAPESCO |
Egypt |
No Image
|
Seawater Intake Culvert Concrete Slab Repair and Impressed Cathodic Protection System Inspection and Recommendation in Al Ghubrah Plant |
Concrete Structures in Many of the Power and Desalination Plants Had Suffered Disintegration of Its Concrete Surface, Deterioration of Concrete, Rusting of Reinforcement and Crack Along and Across the Reinforcement |
2013 |
2015 |
2 |
Study Report, Prequalification of Contractors, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Planning, Forecast |
Al Ghubrah Power & Desalination Co |
Sultanate Of Oman |
No Image
|
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba |
Construction and Maintenance of Totalized Flow Valve Control for Local Farms in Taweelah, Bahia & Rahba – Abu Dhabi Emirate including construction, commissioning and guarantee of 2 pumping stations (3 x 135 m3 /hr) each and rehabilitation of one similar existing pumping station. |
2003 |
2005 |
1.9 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning, and guarantee period. |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Design and Supervision of Desalination Plant at Al Awaifiya in Wilayat Bahla |
RO DESALINATION PLANT OF 200M3/DAY, Wells, Pretreatment, RO System, Post treatment, Product Water Tank, Civil works, Electrical and I&C System. |
2008 |
2011 |
1.8 |
Study and Design, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Design Review, Construction Supervision, Commissioning, Guarantee Services |
Public Authority for Electricity and Water |
Sultanate Of Oman |
|
Design and Construction Supervision of Wadi Protection Wall in (8) Locations in South Batinah Governorate. |
Design and Construction Supervision of Wadi Protection Wall in (8) Locations to Improve the Safety of Farms from Erosion Due to Flash Floods |
2015 |
2017 |
1.8 |
Site Survey, Soil Investigation, Geo-Technical Report, Detailed Design, Tender Document, Construction Management & Supervision |
MOA&F - Ministry of Agriculture and Fisheries |
Sultanate Of Oman |
No Image
|
Design & Construction Supervision Of Wadi Protection Wall In (6) Locations In Muscat Governorate & (1) Location In Dhakhliya Governorate |
Design & Construction Supervision Of Wadi Protection Wall In (6) Locations In Muscat Governorate & (1) Location In Dhakhliya Governorate To Improve The Safety Of Farms From Erosion Due To Flash Floods |
2015 |
2017 |
1.7 |
Site Survey, Soil Investigation, Geo-Technical Report, Detailed Design, Tender Document, Construction Management & Supervision |
|
Sultanate Of Oman |
No Image
|
Chlorination System & Associated Works in the Sharqiya Region |
Water Sterilization – Dis-infection by using Chlorine Dioxide in a Sharqiya Region for 20 water wells at 8 different location |
2004 |
2005 |
1.5 |
Design review & site supervision |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Number of projects: 279
|