English | العربي
Hurgada and Sharm El-Sheikh Power and Desalination Plants (see II)
Description: Two plants at Hurgada and Sharm El-Sheikh each comprising of:2 x 250 m3/day Reverse Osmosis desalination units (originally designed as vapour compression)
Start Date: 1991
Complation Date: 1996
Cost: 1.05 million US $
Services Provided: Optimization study, Engineering Design preparation of Tender Documents, Bids evaluation, post contract duties.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved