Seawater Intake Culvert Concrete Slab Repair and Impressed Cathodic Protection System Inspection and Recommendation in Al Ghubrah Plant |
|
Description: |
Concrete Structures in Many of the Power and Desalination Plants Had Suffered Disintegration of Its Concrete Surface, Deterioration of Concrete, Rusting of Reinforcement and Crack Along and Across the Reinforcement |
Start Date: |
2013 |
Complation Date: |
2015 |
Cost: |
2 million US $ |
Services Provided: |
Study Report, Prequalification of Contractors, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Planning, Forecast |
|
|