English | العربي
Seawater Intake Culvert Concrete Slab Repair and Impressed Cathodic Protection System Inspection and Recommendation in Al Ghubrah Plant
Description: Concrete Structures in Many of the Power and Desalination Plants Had Suffered Disintegration of Its Concrete Surface, Deterioration of Concrete, Rusting of Reinforcement and Crack Along and Across the Reinforcement
Start Date: 2013
Complation Date: 2015
Cost: 2 million US $
Services Provided: Study Report, Prequalification of Contractors, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Planning, Forecast
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved