Supply, installation, testing and commissioning of Sea Water R.O. Plant 2.0 MGD at Al Yassat Al Soghrih Island
Description: Sea Water Reverse Osmosis Plant of capacity 2.0 MGD in four (4) trains complete with pre and post treatment plant, Water storage tanks and interconnection with the existing plant, Electrical supply connection and switchgear system, Automatic control system with PLC Civil, building and foundation works
Start Date: 2006
Complation Date: 2007
Cost: 18 million US $
Services Provided: Consultancy Services For Supply Installation, Testing & Commissioning Of SWRO Plant And Its Auxiliaries including Preparation Of Design Report And Tender Document Evaluation Report Site Supervision