Marsa Alam RO Desalination Plant |
Stage – 1 implementation of 5 phases till 2005 (4MIGD RO Plant) inclusive of all electro-mechanical & civil works & all auxiliaries. The first stage includes 2x500 + 2x1000m3/day units |
1999 |
2000 |
7 |
Study, design, tender documents, bids, evaluation, and pre-contract negotiations |
EMAK Co. for Utilities, Egypt |
Egypt |
|
Lime Treatment Plant for Al Taweelah "A" Desalination Plant |
Lime treatment unit for distillate water complete with tanks, pumps, injection systems,.etc. |
1998 |
2000 |
2 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water and Electricity Department, Abu Dhabi, UAE. |
United Arab Emirates UAE |
|
Sharm El-Sheikh Power & Desalination Plant |
2 x 250MW ISO Gas Turbines.140MW Steam Back Pressure Turbine.5x5 MIGD MED-TVC.2xHRSG boilers in association with gas turbines
|
2001 |
2001 |
450 |
Preliminary Design Report + Economical and financial study for IPWP |
Egyptian Electricity Holding Co. Egypt. |
Egypt |
|
5 RO Desalination Plant |
Supply Installation & Maintenance Of Five Brakish Water Desalination Units Capacity 30,000 Igpd For Different Sites |
1998 |
2001 |
3 |
Studies, Design, Preparation of Tender Documents, Tender Analysis, Post-contract duties including supervision of construction and commissioning and guarantee period
|
Government of Abu Dhabi & Municipality |
United Arab Emirates UAE |
No Image
|
Ras Laffan Power and Desalination Plant |
750 MW combined cycle gas turbine and steam power plant in dual mode with 40 MIGPD (MSF) and desalination plant |
1999 |
2001 |
730 |
Design, cost estimate, preparation of RFP and evaluation of IWP offers for the desalination units. |
Qatar General Petroleum, Corporation (QGPC) Qatar |
Qatar |
|
New Mixing Packing Building Design Review |
Design review for the structure calculation and detailed drawing for the new mixing and packing building |
2000 |
2001 |
3 |
Review structural steel design for new mixing building and the packing building.
- Check the design parameters with the Egyptian code.
- Check and approval the detailed drawings.
-Carry out cross check for the design by built up 4 computer models on longitudinal and transversal frames to check results of the design.
|
Proctor & Gamble |
Egypt |
|
Dismantling and refitting of electro-mechanical equipment at power station |
Dismantling and refitting of electro-mechanical equipment at Umm Al Nar Power Stations |
1999 |
2001 |
3.25 |
Tender Documents, bids evaluation and works supervision |
Water and Electricity Department, Abu Dhabi, UAE. |
Sultanate Of Oman |
|
Repair and Refurbishment of Civil Works for Power Stations & Desalination Plants |
Refurbishment and repair of concrete and reinforced concrete mainly for distiller and turbine foundations, auxiliaries and ancillary concrete building structures deteriorated steel structural supports and damaged drain pipes,etc. |
1999 |
2001 |
15 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water and Electricity Department, Abu Dhabi, UAE |
United Arab Emirates UAE |
|
Refurbishment of 132kV Substation Building |
Different concrete repair works with associated civil works,Air conditioning |
1999 |
2001 |
2.7 |
Bids evaluation and supervision of construction |
Water & Electricity Department |
United Arab Emirates UAE |
|
Marsa Alam Utilities – Phase I |
Utilities for Marsa Alam Development Phase-I includes the overall planning and implementation of the following networks for approx 6’000’000 m2 of tourist development area for 80 resorts including, Water Pumping Stations, Underground/Overground Storage Tanks, Sewage & Storm Water Network, Water Supply & Fire fighting Network, Irrigation Network, Solid Waste Scheme, Electrical Distribution Network, Telecommunications Networks,Utility Control Centre (UCC) |
1999 |
2001 |
30 |
Planning of Utilities and Networks Concept Design ,Phasing Plans, and Cost Estimates Detailed Design & Tech Specifications Preparation of Complete Tender Documents based on detailed designs Evaluation of Tenders – for 5 years 2000 - 2005 |
EMAK Co. for Utilities, Egypt |
Egypt |
|