Engineering Services for Ra-100 Razeen Labour City |
|
Description: |
Assess The Feasibility of Servicing the Potable Water Demands of Razeen Labour City Sector a Using Either of Two Pre–Selected Pipe Sizes for A Temporary Hdpe Water Main Connected to The Existing 900 Mm Dia. Water Main Feeding Al Wathba Palace, Located Approximately 3.5 Km to The North of the Development. |
Start Date: |
2013 |
Complation Date: |
2016 |
Cost: |
0 million US $ |
Services Provided: |
Feasibility Study, Detailed Design, Planning, Forecast |
|
|