El-Ameria new gas turbine power plant 3X63 MW ISO rating |
|
Description: |
Interconnection with The 220kv Network Through The 220/66/11kv - 2x125mva S/S Consists of Three Gas Turbine 33mw Site Rating, 220kv Gis Switchgear, 66kv Ais Indoor Switchgear Both Double Bus Bar One Breaker Scheme and Two Main 125 Mva, 220/66/11 Kv Transformers |
Start Date: |
2012 |
Complation Date: |
2015 |
Cost: |
167 million US $ |
Services Provided: |
Feasibility Study, Study Report, Concept Design, Prequalification of Contractors, Tender Document, Bid Evaluation, Assistance to Prepare Contract, Construction Management & Supervision, Attending Manufactures Tests, Commissioning, Guarantee Supervision |
|
|