English | العربي
Umm Al Nar East Power & Desalination Plant
Description: Two gas turbines, of 91.1 MW ISO rating each, Exhaust Heat Recovery Boilers 2x160 tons/hr, 210C 16 bar, 4 natural gas and liquid fuel fired auxiliary boilers 140 ton/hr each and 3x5/6 MIGPD desalination plant.
Start Date: 1973
Complation Date: 1981
Cost: 160 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, Commissioning and guarantee period.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved