Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Consultancy Services For Upgrading Of Mina Pump Station At Sila. Under Ltra Frameworks Consultancy Contract No. D-10503/A-2 |
Construction of New Water Pumping Station and Related Structure. Construction of Water Storage Reservoirs. Supply And Installation Of New Pumps, Valves, Fittings, Meters,Etc.. |
2012 |
2018 |
0 |
Preliminary and Detailed Design, Tendering Services, Construction Management & Supervision, Guarantee Supervision |
Abu Dhabi Distribution Company |
0 |
No Image
|
Design Consultancy Services In Relation To Construction Of Agricultural Extension Centers In Abu Dhabi, Al Ain And Western Region (Contract No. Pd/Ca/Bps/Ok/R1320/P292-2016-Adafca/17/60) |
Design Consultancy Services for Construction of Eight (8) Farmers’ Services Centers at Various Locations to Promote a Higher Production Levels and Develop an Integrated & Sustainable Agricultural Environment. |
2017 |
2018 |
0 |
Data Collection Or Inception Report (Stage Concept Design Development (Stage- Schematic Design (Stage-Iii), Detail Design Development (Stage – Iv), Tender Documents (Stage-V) , Bidding & Tender Evaluation (Stage-Vi),Design Liaison Services During Project Construction (Stage-Vii) |
MUSANDAH |
United Arab Emirates UAE |
No Image
|
Consultancy Services for Replacement of Existing Water Distribution Network in Mussafah Industrial Area of Eastern Region for Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20 |
Replacement Of Existing Water Distribution Network In Mussafah Industrial Area Of Eastern Region For Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20. The Anticipated Quantity Of Pipelines To Be Replaced Is Approximately 86km With All Associated Civil Works |
2014 |
2018 |
23 |
Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Design of water treatment and desalination System For EL AIN EL SOKHNA Thermal Power Plant 2X650 MW |
Hypochlorite System Make Up Demineralization System Condensate Polisher System Tvc Desalination , Waste Water Treatment , Electrical And I&C . Liberates Equipment |
2009 |
2018 |
24 |
Design Review, Tender Document |
Orascom Construction Industrials |
Egypt |
|
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02 |
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02. The Anticipated Quantity of Pipelines to Be Replaced Is Approximately 39km with All Associated Civil Works |
2013 |
2018 |
16 |
Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Smart Water Network for Madinaty Project |
Phase I: Data Transfer To Consortium To Prepare The Hydraulic Study For All Madinaty Phases .
-Detailed Engineering Of The System Including Scada System For Automatic Control, Prepare BOQ Of Main Equipment
Phase Ii : Preparing Planning Program Of Installation Of Equipment, Follow Up Installation, Testing, Of All Equipment Till Taking Over The Project.
|
2015 |
2018 |
14 |
Data Collection, Hydraulic Studies (Steady State, Un-Steady State), Review Of Current Specification, Site Supervision, Testing, Commissioning Till The Taking Over Of Project, Engineering By Consortium, Review Of BOQ, |
Arab Company for Projects and Urban Development |
Egypt |
|
Updating and Standardizing the Requirements for Smart Network and Metering System |
The Scope Include the Following -Smart Electric Meters Single 3 Phases
-Commutation Networks Complete Between Smart Meters and Scada System
-Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System
-Street Lighting (Option) Small Networks Using Le
-Operation and Maintenance for Two Years.
|
2016 |
2018 |
5 |
Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
|
Zohr Development Project |
Supervision and Coordination Site Staff |
2018 |
2018 |
2 |
Commissioning, Evaluation Report, Technical Report, Inspection And Site Visits ,Analyzing Received Evaluation ,Preparing Technical And Financial Reports Including Recommendation ,Check Compliance With Egyptian Standard ,Check The Function To Monitor And Control If Consumption ,Testing, Commissioning Till The Taking Over Of Project ,Review Technical Data Sheet, Checking Availability To Integrate With Exiting Meters ,Preparing Recommendation Report. |
SAPESCO |
Egypt |
No Image
|
Additional RO Unit Utilizing the Brine of the Existing Plant in Madinaty |
Technical Study Report for Brine of Ro Plant In Madinaty |
2016 |
2018 |
2 |
Study Report |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Zohr Development Project |
Steam Blowing Scope Of Zohr Development Project Is Gas Producing Plant, Including Review Of Subcontractor Preparation Submittals Ready For Contract Time Schedule, Technical Drawing, Calculation Of Different Lengths And Pipes And Review Pipes Support, Review Of Design Work, Site Supervision And Review Subcontractor During Execution Of Steam Blowing At Site |
2018 |
2018 |
2 |
Technical Report, Tender Document, Bid Evaluation, Prequalification Of Contractors, Assistance To Prepare Contract, Construction Management & Supervision, Design Review, Design Report, Advisory Activity, Attending Manufactures Tests, Basic Design, Commissioning, Guarantee Supervision, Evaluation Report, Site Supervision |
SAPESCO |
Egypt |
No Image
|
Number of projects: 279
|