Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Hydrochloric Acid, Caustic Soda, Chlorine & Salt Plant |
160 tons/day Salt Plant, 80 tons/day Brine and Chlorine Cell Plant & 180 tons/day Caustic Soda 50% and H2 gas Plant, 65 tons/day Hcl Plant, 12 tons/day Sodium Hypochlorite Plant, Steel Drum Factory (400 drum/day x 150 kg capacity), Plastic Container Factory. Central workshop, utility house, boiler house, store, administration building, labor and medical services buildings. |
1976 |
1978 |
75 |
Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Abu Dhabi National Oil Company |
United Arab Emirates UAE |
|
Benghazi Power & Desalination Plant, Lybia (Phase I and Phase II) |
Phase I and Phase II each: 3x40 MW condensing turbines + 20 MW BP turbine + 4x1.25 MIGD Desalination Plant |
1976 |
1977 |
120 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction and commissioning. |
Electricity Corporation of Benghazi, Libya |
Libya |
|
Water Distribution Network |
2 high level reservoirs, each of 1/2 Million Gallons, Main Pumping Station, Ductile Cast Iron Pipe of 60 cm. diameter. |
1973 |
1975 |
7 |
Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction and commissioning. |
Water and Electricity Department |
United Arab Emirates UAE |
|
Saadiyat Desalination Plant |
480,000 IGPD Desalination Plant |
1974 |
1975 |
15 |
Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Water and Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Diesel Power Station and Water Desal. Plant Saadiyat Island |
2x3.8 MW Diesel Power Station running on crude oil |
1973 |
1975 |
7 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Dry Stores, Cold Stores, and General Warehouses |
3300 tons of cold storage, 15,000 tons dry storage, 16000 tons common storage and 21000 tons other storage. |
1975 |
1975 |
28 |
Feasibility Study |
U.A.E. Development Bank |
United Arab Emirates UAE |
|
Al Ain Power Station Extension Phase II |
1 x 3.75 MW Diesel Power Station running on crude oil |
1972 |
1974 |
1.2 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Feasibility Study for Power Generation |
Feasibility Study for Power Generation and Electrification for Sultanate of Oman |
1972 |
1973 |
0 |
Feasibility Studies |
Planning & Development Department, |
Sultanate Of Oman |
|
Radio and Television Centre |
Radio and Television Centre with all associated services. |
1971 |
1973 |
43 |
Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning of Elect., Mechanical, Air Conditioning, Fire Protection and Plumbing and Drainage Services. |
Ministry of Public Works - Kuwait |
Kuwait |
|
Diesel Power Station, Nos. 7,8 and 9 Al-Ain |
3x3.75 MW Diesel Power Station running on crude oil |
1971 |
1973 |
2.5 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Number of projects: 279
|