English | العربي
Study For Repeated Damage Of Chlorine Sw Intake Injection Lines At Sidi Krir Power Plant
Description: Carrying Out a Full Assessment of the Repeated Damage to The Rc Sw Intake Chlorine Injection Pipes, Determine The Possible Root Cause(S) Of The Repeated Damage, Recommend The Possible Solution in Details.
Start Date: 2015
Complation Date: 2015
Cost: 757 million US $
Services Provided: Design Review, Geo-Technical Report, Review of Current Specification, Soil Investigation, Topographical Survey, Study Report
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved