Study For Repeated Damage Of Chlorine Sw Intake Injection Lines At Sidi Krir Power Plant |
|
Description: |
Carrying Out a Full Assessment of the Repeated Damage to The Rc Sw Intake Chlorine Injection Pipes, Determine The Possible Root Cause(S) Of The Repeated Damage, Recommend The Possible Solution in Details. |
Start Date: |
2015 |
Complation Date: |
2015 |
Cost: |
757 million US $ |
Services Provided: |
Design Review, Geo-Technical Report, Review of Current Specification, Soil Investigation, Topographical Survey, Study Report |
|
|