Mixing Building Extension & Strengthening of the Existing Mixing Building |
|
Description: |
Build up an Extension phase to the existing mixing building and carrying out all the required strengthening for the existing mixing building steel structure |
Start Date: |
1999 |
Complation Date: |
1999 |
Cost: |
2.5 million US $ |
Services Provided: |
Structural design for the building extension structure check for the stability of the details execution steel drawings specifications and Tender Documents:
- Conducting the site survey for the existing mixing building.
- Structural calculations for the New Extension for the Mixing Building and check the stability of the existing plant.
- Producing all the detailed engineering steel & concrete Drawings.
- Production of the Tender Documents and Technical Specification
|