English | العربي
Mixing Building Extension & Strengthening of the Existing Mixing Building
Description: Build up an Extension phase to the existing mixing building and carrying out all the required strengthening for the existing mixing building steel structure
Start Date: 1999
Complation Date: 1999
Cost: 2.5 million US $
Services Provided: Structural design for the building extension structure check for the stability of the details execution steel drawings specifications and Tender Documents: - Conducting the site survey for the existing mixing building. - Structural calculations for the New Extension for the Mixing Building and check the stability of the existing plant. - Producing all the detailed engineering steel & concrete Drawings. - Production of the Tender Documents and Technical Specification
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved