English | العربي
Sur Power and Desalination Plant
Description: 4x35.4 MW ISO Rating Gas Turbine and 2 MIGPD desalination plant including sea water intake facilities. 4 MG water storage facility, blending, chemical conditioning, chlorination, civil works, pumping station with necessary piping system to join the plant with water system in Sur, and all necessary auxiliaries.
Start Date: 1986
Complation Date: 1986
Cost: 65 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning. N.B.: The project activities have been with hold before preparation of Tender Document and after Engineering design which included submission of comparative study and outline design report which -in turn- have been discussed and approved with comments by the Client.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved