English | العربي
Abu Dhabi Steam Power Station
Description: 15 MW Steam back pressure steam turbine power station and its associated dual fuel (natural gas and crude oil), power boiler (110 t/h) with auxiliaries and accessories.
Start Date: 1970
Complation Date: 1973
Cost: 5 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction and commissioning.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved