English | العربي
CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS.
Description: CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS.
Start Date: 2019
Complation Date: 2023
Cost: 15 million US $
Services Provided: DESIGN REPORT – DRAWINGS - PRICE LIST – B.O.Q - ENGINEERING WORKS – SITE SUPERVISION
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved