STRUCTURAL DESIGN AND VERIFICATION CONSULTANCY OF STABILITY OF EXISTING VALVE CHAMBER AND WASH FOR ADDC CONTRACT D-8601 |
|
Description: |
CONSULTANCY SERVICES FOR
STRUCTURAL DESIGN
CALCULATION OF THRUST BLOCKS
ON THE TIE-IN CONNECTION OF
THE OD335MM HDPE PIPELINE
WITH DN1200MM DI PIPELINE |
Start Date: |
2021 |
Complation Date: |
2021 |
Cost: |
0 million US $ |
Services Provided: |
STRUCTURAL DESIGN
VERIFICATION |
|
|