Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Residential Complex for Kuraimat Power Station |
Residential Complex: flats, villas, club, schools, rest house, mosque and super market |
1994 |
1995 |
2.5 |
Residential Complex: flats, villas, club, mosque and clinic |
Ministry of Electricity, Egyptian Electricity Authority |
Egypt |
|
Light Industries Plant |
Plant for manufacturing light products: bags, socks, and other light products |
1990 |
1991 |
1 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation and Supervision of Construction |
Egypt Light Industries Co., |
Egypt |
|
Maintenance Facility Building and Concrete Repair Works for Umm al-Nar Power Plant |
Maintenance facility building,Different concrete repair works
|
1992 |
1994 |
10 |
Preparation of Tender Documents, Bids Evaluation and Construction Supervision |
Water & Electricity Department |
United Arab Emirates UAE |
|
The University City Hospital, Baghdad (Phase One) |
Electro-mechanical works for 1000 Bed Hospital |
1969 |
1970 |
1.2 |
Design and Preparation of Construction Drawings for Electrical Contractor, M/s. WETCO Baghdad |
M/s. WETCO Baghdad |
Iraq |
|
Kuwait, Al-Arabi, al-Qadisya and Kasma Sporting Clubs |
All buildings, stadiums, playing courts, swimming pools, squash courts, boxing rings and typical gymnasium for 1000 persons for three clubs. |
1974 |
1978 |
24 |
Engineering Design, preparation of Tender Documents for Electrical, Mechanical and Drainage & Plumbing Services. |
Ministry of Public Works Kuwait |
Kuwait |
|
Dry Stores, Cold Stores, and General Warehouses |
3300 tons of cold storage, 15,000 tons dry storage, 16000 tons common storage and 21000 tons other storage. |
1975 |
1975 |
28 |
Feasibility Study |
U.A.E. Development Bank |
United Arab Emirates UAE |
|
Hydrochloric Acid, Caustic Soda, Chlorine & Salt Plant |
160 tons/day Salt Plant, 80 tons/day Brine and Chlorine Cell Plant & 180 tons/day Caustic Soda 50% and H2 gas Plant, 65 tons/day Hcl Plant, 12 tons/day Sodium Hypochlorite Plant, Steel Drum Factory (400 drum/day x 150 kg capacity), Plastic Container Factory. Central workshop, utility house, boiler house, store, administration building, labor and medical services buildings. |
1976 |
1978 |
75 |
Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Abu Dhabi National Oil Company |
United Arab Emirates UAE |
|
Radio and Television Centre |
Radio and Television Centre with all associated services. |
1971 |
1973 |
43 |
Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning of Elect., Mechanical, Air Conditioning, Fire Protection and Plumbing and Drainage Services. |
Ministry of Public Works - Kuwait |
Kuwait |
|
Kuwait International Air Port |
Electric Power Supply, Emergency Diesel Generators, Lighting System, communication System. |
1967 |
1969 |
9 |
Engineering Design, Preparation of Tender Documents, Testing and Commissioning of Mechanical & Electrical Works. |
Ministry of Public Works - Kuwait |
Kuwait |
|
Replacement Desalination plant 200m3/day at Sheesa Musandam Governorate |
RO plant 200m3/day,Drilling two wells,2 borehole pumps,Transmission pipeline,50m3/day water tank,HDPE brine discharge,Guard house,Power supply from grid to plant,Rehabilitation for existing jetty.
|
2004 |
2006 |
0.26 |
Design review and construction supervision |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Number of projects: 279
|