Projects
Type:
Project Status:
Project Details:
Type Detail:
Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
AbuTaraba Desalination Plant Plant Capacity 40.000 M3/D (3x13,340M3/D), 3x80 M3/Hr Aux. Boilers, Product Water Pipeline About 15 Km,All auxiliaries and ancillaries, 2x20,000 M3 water tanks, Automatic control system including DCS, PLC and data transmission. 2004 2007 90 Review of design, supervision of erection until guarantee period. General Electric Co. of Libya. Libya
Sea water cooling pumping plant Phase I and II - Shuaiba Phase I: 3x19500 m3/hr variable speed pumps + 5x18250 m3/hr fixed speed pumps + sea water chlorination plant + 11kv/380V substation + process computer and instrumentation system. Phase II: 4x10500 m3/hr variable speed pumps + 2x5MW diesel generators + 11KV substation. 1981 1988 90 Preliminary studies, Design of electrical, instrumentation and control systems pertaining to the work, preparation of Tender Documents, Tender Analysis, Post Contract duties including supervision of construction and commissioning. Shuaiba Area Authority, Kuwait Kuwait
Wastewater Tratments Plant in Madinaty Sewage Water Treatment Plant with Capacity 160,000 M3/day in two phases & Reuse for Irrigation, Biogas & Power Production, Mixing with Solid waste for Sludge treatment for fertilizers in 2/3 phases. 2011 2015 80 Technical & Financial Evaluation of the Process and all components, Review of the preliminary hydraulic Calculation, prequalification of bidders, O&M Offer Review, Evaluation Report. Arab Company for Projects and Urban Development Egypt
Hydrochloric Acid, Caustic Soda, Chlorine & Salt Plant 160 tons/day Salt Plant, 80 tons/day Brine and Chlorine Cell Plant & 180 tons/day Caustic Soda 50% and H2 gas Plant, 65 tons/day Hcl Plant, 12 tons/day Sodium Hypochlorite Plant, Steel Drum Factory (400 drum/day x 150 kg capacity), Plastic Container Factory. Central workshop, utility house, boiler house, store, administration building, labor and medical services buildings. 1976 1978 75 Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation Abu Dhabi National Oil Company United Arab Emirates UAE
Upgrading of Mirfa, Madinat Zayed, Water Transmission Scheme DN 900mm pipeline (DI) from Mirfa to Madinate Zayed (70 km),Two pumps in existing pumping stations, MCC’s, Power and control tanks 2x2 MG,DN 900 pipeline (DI) room Madinate Zayed to Mazaira,2x6 MIG + 1x5 MIG concrete reservoirs,Investigation and conversion to VFD of existing motors,Automatic control system. 2004 2009 75 Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up Abu Dhabi Water and Electricity Authority (ADWEA) United Arab Emirates UAE
Upgrading of Mirfa-Madinat Zayed-Mazairah and Liwa Area, Water Transmission Scheme The transmission pipe line scope of work comprises construction of main transmissions for new DN 800mm CS (62.0km) from Mirfa Pump Station to Madinat Zayed Pump Station,Construction of new pump station at Mirfa (Lot c) which shall feed the new CS DN 800mm transmission pipeline total capacity 19.09 MIGD & total head 390m,Construction of new distribution pump station at Madinat Zayed which feed the existing DN 900mm to Madinat Zayed, Madinat Mohamed and new housing development total capacity 11.7. MIGD & total head 45m, Construction of four (4) concrete reservoirs at Madiant Zayed Pump Station with a capacity of 1.5MIG each complete with all incoming and outgoing pipe work, balance line, over flow, drains valves, fitting 2004 2011 75 Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up TRANSCO United Arab Emirates UAE
SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE FOR SMART PREPAID METERS, BILLING AND MANAGEMENT SYSTEM. STATE OF ART TECHNOLOGIES,APPLICATION AND SOLUTIONS FOR THE DESIGN, SUPPLY, INSTALLATION, ALL WIRING AND CABLE CONNECTIONS, TESTING, COMMUNICATION AND WARRANTEE OF A COMPLETE OPEN ADVANCE METERING INFRASTRUCTURE (AMI), MANAGEMENT AND BILLING SYSTEM FOR MADINATY SMART METERING NETWORK INCLUDING PREPAID ELECTRIC AND WATER METERS. THE AMI, MANAGING AND BILLING SYSTEMS SHALL BE AN OPEN SYSTEM TO INTEGRATE WITH DIFFERENT TYPES OF STANDARD PREPAID METERS, USING STANDARD PROTOCOL TO COMMUNICATE ACCURATELY WITH BILLING AND VENDING SYSTEM EQUIPMENT. 2019 2021 70 GENERAL MANAGEMENT OF THE PROJECT DURING THE CONTRACT PERIOD INCLUDING THE GUARANTEE PERIOD FOR TWO YEARS. - REVIEW OF THE DETAILED DESIGN DRAWINGS AND SPECIFICATIONS SUBMITTED BY CONTRACTOR (ELSWEDY INTELLIGENCE) VIA MEPC. - REVIEW THE TIME SCHEDULE OF PROJECT TO MATCH WITH CONTRACT PERIOD (SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE). - FOLLOW UP THE INSTALLATION, TESTING, COMMISSIONING AND GUARANTEE OF SMART NETWORK FOR BILLING AND MANAGING SYSTEM BY THE FOLLOWING METHODS. - SITE SUPERVISION BY ONE OF OUR QUALIFIED ENGINEERS FOR INSTALLATION, TESTING AND COMMISSIONING OF MAIN CONTROL MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE. - SUITABLE NUMBER OF VISITS TO FOLLOW UP INSTALLATION, CONNECTION OF SMART METERS WITHIN THE TELECOMMUNICATION NETWORK SUBJECT TO CONTRACTOR TIME SCHEDULE. - EXPERT IN TELECOMMUNICATION NETWORK FOR ONE VISIT PER MONTH TO EVALUATE AND FOLLOW Up THE INTEGRATION WITH THE EXISTING PREPAID METERS AND NEW MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE. - PREPARING A MONTHLY REPORT TO MEPC REGARDING PROGRESS OF ACTIVITIES IN ACCORDANCE OF APPROVED TIME SCHEDULE AND ACTUAL PROGRESS OF WORKS - CHECKING AND REVIEWING OF CONTRACTOR HANDING OVER CERTIFICATE (H.O.C) AND GUARANTEE PERIOD FOR TWO YEARS. - CHECKING, REVIEWING AND SIGNING CONTRACTOR INVOICES SUBJECT TO ACTUAL PROGRESS AS PER APPROVED TIME SCHEDULE MADINATY ELECTROMECHANICAL POWER COMPANY (MEPC) Egypt
Sur Power and Desalination Plant 4x35.4 MW ISO Rating Gas Turbine and 2 MIGPD desalination plant including sea water intake facilities. 4 MG water storage facility, blending, chemical conditioning, chlorination, civil works, pumping station with necessary piping system to join the plant with water system in Sur, and all necessary auxiliaries. 1986 1986 65 Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning. N.B.: The project activities have been with hold before preparation of Tender Document and after Engineering design which included submission of comparative study and outline design report which -in turn- have been discussed and approved with comments by the Client. Water and Electricity Department, Abu Dhabi, End user: Ministry of Electricity and Water, Sultanate of Oman Sultanate Of Oman
Ltra- Framework Consultancy Services For Improvement / Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi Framework Consultancy Services For Improvement/Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi 2010 2016 60.1 Master Plan,Review Of Current Specification,Site Survey,Topographical Survey ,Soil Investigation,Study Report,Basic Design,Detailed Design,Tender Document,Bid Evaluation,Construction Management & Supervision,Guarantee Supervision Abu Dhabi Distribution Company United Arab Emirates UAE
Construction of Integrated Simple Cycle Gas Turbine Power Plant at SUR Construction of a New Power plant with 2X30 or 3X20 MW Simple Cycle gas turbine at Birbuira site in SUR integrated with existing MEW network at SUR 1998 1998 60 Preparing Study Report and Design Report Public Authority for Electricity and Water PAEW Sultanate Of Oman
Number of projects: 279
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved