Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
AbuTaraba Desalination Plant |
Plant Capacity 40.000 M3/D (3x13,340M3/D), 3x80 M3/Hr Aux. Boilers, Product Water Pipeline About 15 Km,All auxiliaries and ancillaries, 2x20,000 M3 water tanks, Automatic control system including DCS, PLC and data transmission. |
2004 |
2007 |
90 |
Review of design, supervision of erection until guarantee period. |
General Electric Co. of Libya. |
Libya |
|
Sea water cooling pumping plant Phase I and II - Shuaiba |
Phase I: 3x19500 m3/hr variable speed pumps + 5x18250 m3/hr fixed speed pumps + sea water chlorination plant + 11kv/380V substation + process computer and instrumentation system. Phase II: 4x10500 m3/hr variable speed pumps + 2x5MW diesel generators + 11KV substation.
|
1981 |
1988 |
90 |
Preliminary studies, Design of electrical, instrumentation and control systems pertaining to the work, preparation of Tender Documents, Tender Analysis, Post Contract duties including supervision of construction and commissioning. |
Shuaiba Area Authority, Kuwait |
Kuwait |
|
Wastewater Tratments Plant in Madinaty |
Sewage Water Treatment Plant with Capacity 160,000 M3/day in two phases & Reuse for Irrigation, Biogas & Power Production, Mixing with Solid waste for Sludge treatment for fertilizers in 2/3 phases. |
2011 |
2015 |
80 |
Technical & Financial Evaluation of the Process and all components, Review of the preliminary hydraulic Calculation, prequalification of bidders, O&M Offer Review, Evaluation Report. |
Arab Company for Projects and Urban Development |
Egypt |
|
Hydrochloric Acid, Caustic Soda, Chlorine & Salt Plant |
160 tons/day Salt Plant, 80 tons/day Brine and Chlorine Cell Plant & 180 tons/day Caustic Soda 50% and H2 gas Plant, 65 tons/day Hcl Plant, 12 tons/day Sodium Hypochlorite Plant, Steel Drum Factory (400 drum/day x 150 kg capacity), Plastic Container Factory. Central workshop, utility house, boiler house, store, administration building, labor and medical services buildings. |
1976 |
1978 |
75 |
Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation |
Abu Dhabi National Oil Company |
United Arab Emirates UAE |
|
Upgrading of Mirfa, Madinat Zayed, Water Transmission Scheme |
DN 900mm pipeline (DI) from Mirfa to Madinate Zayed (70 km),Two pumps in existing pumping stations, MCC’s, Power and control tanks 2x2 MG,DN 900 pipeline (DI) room Madinate Zayed to Mazaira,2x6 MIG + 1x5 MIG concrete reservoirs,Investigation and conversion to VFD of existing motors,Automatic control system. |
2004 |
2009 |
75 |
Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up |
Abu Dhabi Water and Electricity Authority (ADWEA) |
United Arab Emirates UAE |
|
Upgrading of Mirfa-Madinat Zayed-Mazairah and Liwa Area, Water Transmission Scheme |
The transmission pipe line scope of work comprises construction of main transmissions for new DN 800mm CS (62.0km) from Mirfa Pump Station to Madinat Zayed Pump Station,Construction of new pump station at Mirfa (Lot c) which shall feed the new CS DN 800mm transmission pipeline total capacity 19.09 MIGD & total head 390m,Construction of new distribution pump station at Madinat Zayed which feed the existing DN 900mm to Madinat Zayed, Madinat Mohamed and new housing development total capacity 11.7. MIGD & total head 45m, Construction of four (4) concrete reservoirs at Madiant Zayed Pump Station with a capacity of 1.5MIG each complete with all incoming and outgoing pipe work, balance line, over flow, drains valves, fitting
|
2004 |
2011 |
75 |
Investigation, concept and detailed design, all surveys, tendering, site supervision and warranty follow up
|
TRANSCO |
United Arab Emirates UAE |
|
SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE FOR SMART PREPAID METERS, BILLING AND MANAGEMENT SYSTEM. |
STATE OF ART TECHNOLOGIES,APPLICATION AND SOLUTIONS FOR THE DESIGN, SUPPLY,
INSTALLATION, ALL WIRING AND
CABLE CONNECTIONS, TESTING, COMMUNICATION AND WARRANTEE OF A COMPLETE OPEN ADVANCE METERING
INFRASTRUCTURE (AMI), MANAGEMENT AND BILLING SYSTEM FOR MADINATY SMART
METERING NETWORK INCLUDING
PREPAID ELECTRIC AND WATER METERS.
THE AMI, MANAGING AND BILLING
SYSTEMS SHALL BE AN OPEN SYSTEM TO INTEGRATE WITH DIFFERENT TYPES OF STANDARD PREPAID METERS, USING
STANDARD PROTOCOL TO COMMUNICATE ACCURATELY WITH BILLING AND VENDING SYSTEM EQUIPMENT. |
2019 |
2021 |
70 |
GENERAL MANAGEMENT OF THE PROJECT DURING THE CONTRACT PERIOD INCLUDING THE GUARANTEE PERIOD FOR TWO YEARS.
- REVIEW OF THE DETAILED
DESIGN DRAWINGS AND
SPECIFICATIONS SUBMITTED BY CONTRACTOR (ELSWEDY
INTELLIGENCE) VIA MEPC.
- REVIEW THE TIME SCHEDULE OF PROJECT TO MATCH WITH CONTRACT PERIOD (SUPPLY, INSTALLATION, MAINTENANCE AND GUARANTEE).
- FOLLOW UP THE INSTALLATION, TESTING, COMMISSIONING AND
GUARANTEE OF SMART
NETWORK FOR BILLING AND
MANAGING SYSTEM BY THE
FOLLOWING METHODS.
- SITE SUPERVISION BY ONE OF OUR QUALIFIED ENGINEERS FOR INSTALLATION, TESTING AND COMMISSIONING OF MAIN CONTROL MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE.
- SUITABLE NUMBER OF VISITS TO FOLLOW UP INSTALLATION,
CONNECTION OF SMART METERS WITHIN THE
TELECOMMUNICATION NETWORK
SUBJECT TO CONTRACTOR TIME SCHEDULE.
- EXPERT IN
TELECOMMUNICATION NETWORK FOR ONE VISIT PER MONTH TO
EVALUATE AND FOLLOW Up THE INTEGRATION WITH THE EXISTING PREPAID METERS AND NEW MANAGEMENT AND BILLING SYSTEM SUBJECT TO CONTRACTOR TIME SCHEDULE.
- PREPARING A MONTHLY
REPORT TO MEPC REGARDING
PROGRESS OF ACTIVITIES IN ACCORDANCE OF APPROVED TIME SCHEDULE AND ACTUAL PROGRESS OF WORKS
- CHECKING AND REVIEWING OF CONTRACTOR HANDING OVER CERTIFICATE (H.O.C) AND GUARANTEE PERIOD FOR TWO YEARS.
- CHECKING, REVIEWING AND SIGNING CONTRACTOR INVOICES SUBJECT TO ACTUAL PROGRESS
AS PER APPROVED TIME
SCHEDULE |
MADINATY ELECTROMECHANICAL POWER COMPANY (MEPC) |
Egypt |
|
Sur Power and Desalination Plant |
4x35.4 MW ISO Rating Gas Turbine and 2 MIGPD desalination plant including sea water intake facilities. 4 MG water storage facility, blending, chemical conditioning, chlorination, civil works, pumping station with necessary piping system to join the plant with water system in Sur, and all necessary auxiliaries. |
1986 |
1986 |
65 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning.
N.B.: The project activities have been with hold before preparation of Tender Document and after Engineering design which included submission of comparative study and outline design report which -in turn- have been discussed and approved with comments by the Client.
|
Water and Electricity Department, Abu Dhabi, End user: Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Ltra- Framework Consultancy Services For Improvement / Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi |
Framework Consultancy Services For Improvement/Reinforcement, Extension And Development Of Water Distribution Networks In Western Region, Abu Dhabi |
2010 |
2016 |
60.1 |
Master Plan,Review Of Current Specification,Site Survey,Topographical Survey ,Soil Investigation,Study Report,Basic Design,Detailed Design,Tender Document,Bid Evaluation,Construction Management & Supervision,Guarantee Supervision |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Construction of Integrated Simple Cycle Gas Turbine Power Plant at SUR |
Construction of a New Power plant with 2X30 or 3X20 MW Simple Cycle gas turbine at Birbuira site in SUR integrated with existing MEW network at SUR
|
1998 |
1998 |
60 |
Preparing Study Report and Design Report
|
Public Authority for Electricity and Water PAEW |
Sultanate Of Oman |
|
Number of projects: 279
|