Projects
Type:
Project Status:
Project Details:
Type Detail:
Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
Madinaty Data transmission between Meters and Main server Madinaty Data transmission between Meters and Main server 2018 2019 0 Project Management, Technical Report Madinaty Electromechanical Power Company (MEPC) Egypt No Image
upgrading of al yossr desalination plant to produce 80000 m3/day Sea Water Desalination Plant With Capacity 40000 M3/Day, Sea Water Intake Including 6x630mm Suction Pipelines, Product Water Storage Tank With Capacity 20000 M3, Pumping Station And Service Building, 8x5000 M3/Day(Ah 5x8000 M3/Day)Ro Units & 3x630 Mm Reject Pipelines 2012 2018 111 Project Management, Review Concept Design & Tender Document, Bid Evaluation, Assistance to Prepare Contract, Design Review, Construction Management & Supervision, Guarantee Supervision National Organization for Potable Water and Sanitary Drainage(NOPWASD) Egypt
Consultancy Services For Upgrading Of Mina Pump Station At Sila. Under Ltra Frameworks Consultancy Contract No. D-10503/A-2 Construction of New Water Pumping Station and Related Structure. Construction of Water Storage Reservoirs. Supply And Installation Of New Pumps, Valves, Fittings, Meters,Etc.. 2012 2018 0 Preliminary and Detailed Design, Tendering Services, Construction Management & Supervision, Guarantee Supervision Abu Dhabi Distribution Company 0 No Image
Design Consultancy Services In Relation To Construction Of Agricultural Extension Centers In Abu Dhabi, Al Ain And Western Region (Contract No. Pd/Ca/Bps/Ok/R1320/P292-2016-Adafca/17/60) Design Consultancy Services for Construction of Eight (8) Farmers’ Services Centers at Various Locations to Promote a Higher Production Levels and Develop an Integrated & Sustainable Agricultural Environment. 2017 2018 0 Data Collection Or Inception Report (Stage Concept Design Development (Stage- Schematic Design (Stage-Iii), Detail Design Development (Stage – Iv), Tender Documents (Stage-V) , Bidding & Tender Evaluation (Stage-Vi),Design Liaison Services During Project Construction (Stage-Vii) MUSANDAH United Arab Emirates UAE No Image
Consultancy Services for Replacement of Existing Water Distribution Network in Mussafah Industrial Area of Eastern Region for Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20 Replacement Of Existing Water Distribution Network In Mussafah Industrial Area Of Eastern Region For Sectors M-9, M-10, M-11, M-12, M-13, M-14, M-15, M-16 & M-20. The Anticipated Quantity Of Pipelines To Be Replaced Is Approximately 86km With All Associated Civil Works 2014 2018 23 Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision Abu Dhabi Distribution Company United Arab Emirates UAE
Design of water treatment and desalination System For EL AIN EL SOKHNA Thermal Power Plant 2X650 MW Hypochlorite System Make Up Demineralization System Condensate Polisher System Tvc Desalination , Waste Water Treatment , Electrical And I&C . Liberates Equipment 2009 2018 24 Design Review, Tender Document Orascom Construction Industrials Egypt
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02 Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02. The Anticipated Quantity of Pipelines to Be Replaced Is Approximately 39km with All Associated Civil Works 2013 2018 16 Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision Abu Dhabi Distribution Company United Arab Emirates UAE
Smart Water Network for Madinaty Project Phase I: Data Transfer To Consortium To Prepare The Hydraulic Study For All Madinaty Phases . -Detailed Engineering Of The System Including Scada System For Automatic Control, Prepare BOQ Of Main Equipment Phase Ii : Preparing Planning Program Of Installation Of Equipment, Follow Up Installation, Testing, Of All Equipment Till Taking Over The Project. 2015 2018 14 Data Collection, Hydraulic Studies (Steady State, Un-Steady State), Review Of Current Specification, Site Supervision, Testing, Commissioning Till The Taking Over Of Project, Engineering By Consortium, Review Of BOQ, Arab Company for Projects and Urban Development Egypt
Updating and Standardizing the Requirements for Smart Network and Metering System The Scope Include the Following -Smart Electric Meters Single 3 Phases -Commutation Networks Complete Between Smart Meters and Scada System -Complete Billing System and Remote Control of All Meters Via Gprs/ Rf / Fo Netw -K -Remote Control of Meter Tarff: Monitoring All Mv/Lv/ Network in Scada System -Street Lighting (Option) Small Networks Using Le -Operation and Maintenance for Two Years. 2016 2018 5 Data Collection, Tender Document, Prequalification Of Contractors, Analyzing Received Evaluation, Preparing Technical And Financial Reports Including Recommendation, Still Contractor Is Not Selected By MEPC Madinaty Electromechanical Power Company (MEPC) Egypt
Zohr Development Project Supervision and Coordination Site Staff 2018 2018 2 Commissioning, Evaluation Report, Technical Report, Inspection And Site Visits ,Analyzing Received Evaluation ,Preparing Technical And Financial Reports Including Recommendation ,Check Compliance With Egyptian Standard ,Check The Function To Monitor And Control If Consumption ,Testing, Commissioning Till The Taking Over Of Project ,Review Technical Data Sheet, Checking Availability To Integrate With Exiting Meters ,Preparing Recommendation Report. SAPESCO Egypt No Image
Number of projects: 279
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved