Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Consultancy Services for Supply and Installation of Boom at Ghubrah Power and Desalination Plant |
Gather Geotechnical information like tide pattern, water current, wind velocity, depth of seabed from shore to shore at intake, find a permanent boom, prepare detail relevant drawings of boom |
2004 |
2005 |
0.4 |
Preparing Study Report and Prepare scope of work for bidding contractor |
Ministry of Housing Electricity and Water (MHEW) |
Sultanate Of Oman |
|
Repair Treatment of Cracked Concrete Structures at Port Said |
Repair of Cracked Concrete Structures Including Intake System at Port Said East Power Plant |
2016 |
2017 |
0.4 |
Study Report, Design of Repair of Cracked Concrete Structure |
Suez Gulf Power |
Egypt |
No Image
|
Repair - Treatment of Cracked Concrete Structure At Sgp Plant |
Supervision Of The Concrete Repair Works To The Cracked Concrete Structures At Suez Gulf Power Plant At Sukhna-Suez |
2016 |
2016 |
0.4 |
Bid Evaluation, Site Supervision |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Prepaid Gprs Controlled Irrigation Meter Dn 100 |
-Review of Prepaid Irrigation Meter.
-Issue Comments About the Submitted Offer.
-Giving Recommendation to Tmg
|
2016 |
2016 |
0.45 |
Check Compliance With Egyptian Standard, Checking Availability To Integrate With Exiting Meters, Review Of Current Specification, Preparing Recommendation Report., Bid Evaluation |
Arab Company for Projects and Urban Development |
Egypt |
No Image
|
Garden lights in Capital Garden |
Installation of 149 Nos. decorative lighting poles with 2 lanterns, 20 Nos. poles with 150 W, 100 Ground spot lights of 100 W and 63 Nos. of suspended flood light |
2000 |
2002 |
0.5 |
Engineering Design, preparing Tender Documents, Bids Evaluation, Post Contract Duties including supervision of construction and commissioning |
Abu Dhabi Municipality |
United Arab Emirates UAE |
|
Dabaa Experimental RO Sea Water Desalination Plant |
100 m3/day for nuclear power station complete with beach wells, elect. & I/C works. |
1997 |
2005 |
0.5 |
Preparation of tender documents, bids evaluation and post contract duties |
Nuclear Power Plant Authority, Egypt |
Egypt |
|
Construction Services For Phase III Seawater Intake Culvert Concrete Slab Repair And Impressed Current Cathodic Protection System Inspection And Recommendation In Al Ghubrah Plant |
Checking And Recommendation, Preparation Of Necessary Scope Of Work For Repair, Commercial & Technical Evaluation Of Offers Received From The Contractors, Inspection The Impressed Current Cathodic Protection Supervision Of Project Execution And Submission Of Work Completion Report |
2013 |
2015 |
0.5 |
Collect Of Data, Studying, Preparing The Tender Document, Technical & Commercial Evaluation And Site Supervision
|
Al Ghubrah Power & Desalination Co. GPDCO |
Sultanate Of Oman |
No Image
|
Connect seawater intake line from phase III intake to phase II settling basin |
seawater supply discharge lines coming from the seawater intake channel via five seawater pumps to seawater pumps to seawater discharge header supplying raw seawater to desalination units 5,6,1,2
|
2013 |
2014 |
0.5 |
Study Report, Concept Design,
|
Al Ghubrah Power & Desalination Co. GPDCO / Millions |
Sultanate Of Oman |
No Image
|
Transmission Pipeline Within City and Industrial Area – Ajman |
Transmission Pipeline Within City and Industrial Area – Ajman |
2014 |
2015 |
0.5 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Technical Evaluation Report About Advanced Meter Infrastructure (Ami) For Madinaty Project. |
Review The Technical Submission of Supplier (Golden Power & Having Co.) And Evaluation the Preliminary Offer Against International Standard. |
2014 |
2015 |
0.5 |
Evaluation Report, Data Collection, Review of Current Specification |
Madinaty Electromechanical Power Company (MEPC) |
Egypt |
No Image
|
Number of projects: 279
|