Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Consultancy Services for Design Stability of Piping System in Pump Room - The Development of South Shamkha Infrastructure, Lot-1 (Cont No. 2011/61) - Pipe Stress Analysis |
Design Stability of Piping System in Pump Room - The Development Of South Shamkha Infrastructure, Lot-1 - Pipe Stress Analysis |
2014 |
2015 |
0 |
Hydraulic Studies (Steady State, Un-Steady State), Hydraulic Model, Detailed Design |
Federal Electricity & Water Authority FEWA |
United Arab Emirates UAE |
No Image
|
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin |
Consultancy Services for Supervision of Construction of Sea Water Pipeline Construction from Phase 3/Phase 1 Diversion Point and Extend Towards Phase 2 Settling Basin |
2013 |
2015 |
0 |
Site Supervision, Inspection and Site Visits |
Ghubrah Power & Desalination Company SAOC |
Sultanate Of Oman |
No Image
|
Madinaty Irrigation Networks |
Automatic Irrigation Networks for different areas in Madinaty |
2010 |
2010 |
0.2 |
Technical & Financial Evaluation |
Arab Company for Projects and Urban Development |
Egypt |
|
Consultancy Services For Design And Tendering Services For Load Shifting To Mobellah Grid Station – B |
Design, prepare tender documents and drawing for 33KV cable feeders and necessary 33kv SF6 breakers for utilizing the existing 33kv cables, etc to shifting the load to New Mobellah Grid Station.
|
2015 |
2015 |
0.2 |
Site Survey,Technical Report,Tender Document,Bid Evaluation |
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
Consultancy Services For Design And Tendering Services For Load Shifting To Ghala Grid Station |
Design, Prepare Tender Documents And Drawing For 33kv Cable Feeders And Necessary 33kv Sf6 Breakers For Utilizing The Existing 33kv Cables To Shift The Existing 33kv Load From The Bausher And Airport Heights Grid Station To The Newly Proposed Ghala Grid Station
|
2015 |
2015 |
0.2 |
Site Survey,Technical Report,Tender Document,Bid Evaluation |
MUSCAT ELECTRICITY DISTRIBUTION COMPANY |
Sultanate Of Oman |
No Image
|
ANRPC Steam Blowing Scope |
New Ccr & Platforming Unit Block A&B Refine Naptha And Jet Fuel . Phase 1 Including Review of Subcontractor Preparation Submittals Ready for Contract Time Schedule, Technical Drawing, Calculation of Different Lengths and Pipes Support, Review of Design Work. Phase2 Site Supervision and Review Subcontractor During Execution of Steam Blowing at Site. |
2017 |
2018 |
0.2 |
Project Management, Study Report, Concept Design, Prequalification Of Contractors, Review Of Current Specification, Tender Document, Bid Evaluation, Assistance To Prepare Contract, Construction Management & Supervision, Design Review, Attending Manufactures Tests, Commissioning, Guarantee Supervision, Basic Design, Evaluation Report, Technical Report |
SAPESCO |
Egypt |
No Image
|
Replacement Desalination plant 200m3/day at Sheesa Musandam Governorate |
RO plant 200m3/day,Drilling two wells,2 borehole pumps,Transmission pipeline,50m3/day water tank,HDPE brine discharge,Guard house,Power supply from grid to plant,Rehabilitation for existing jetty.
|
2004 |
2006 |
0.26 |
Design review and construction supervision |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Consultancy Services for Design of Agriculture land Protection allocated along the flood Drainage Channel ( Al Rass Channel ) at Al Hamra Welaiyat Al Dakhilya Governorate |
Construction and Modification of the Flood Drainage Channel at Al Hamra Welaiyat in Al Dakhiliya Governorate |
2015 |
2016 |
0.269 |
Recommend The Successful Tenderer, Tender Document, Data Collection, Preliminary And Detailed Design, Final Recommendation, Site Survey |
MOA&F - Ministry of Agriculture and Fisheries |
Sultanate Of Oman |
No Image
|
Concrete Testing and Structural Integrity to Mv&Lv Switchgear Room Building at Elsokhna Power Plant |
Suez Golf Power Plant at Km 52 Suez City Ain Soukhna Structural Integrity Report |
2015 |
2015 |
0.3 |
Soil Investigation, Structural Integrity Report |
Powertek Energy SDN BHD |
Egypt |
No Image
|
Economical & Technical Studies |
Ten selected Power and Desalination plants. |
1978 |
1979 |
0.4 |
Economical and Technical Studies of ten selected plants producing Electricity and Distillate Water. |
Saline Water Conversion Corporation (SWCC) Saudi Arabia |
Saudi Arabia |
|
Number of projects: 279
|