2x(500-600)MW Power Station with the Associated Transmission System Reinforcements |
Study the different fuel alternative (including coal) to select the feasible & viable and least cost solution for fuel to build power station 500-600 mw in Aden and Hodeidah, study the impact of adding the power station on the national grid and transmission system reinforcement needed. |
2013 |
2020 |
1200 |
Feasibility study, study
Report, concept design,
Tender document
|
MINISTRY OF ELECTRICITY AND ENERGY |
Yemen |
|
NEW ASSUIT COMBINED CYCLE ENGINEERING WORKS FOR WASTE WATER DISCHARGE |
ENGINEERING WORKS FOR
WASTEWATER DISCHARGE
INCLUDING BLOWDOWN PUMPS/
PIPING RO PROJECTS, BRINE
PIPING DEEP WELL PUMPS,
RECHARGE, PUMPS, PROTECTION
WORKS AND CIVIL ENGINEERING
PIPING WORKS |
2019 |
2020 |
1500 |
1-DATA VERIFICATION AND
REVIEW
2-DEVIEW OF PUMPS/ PIPING
WITH CALCULATION OF THE
HYDRAULIC GRADIENT AND
RECOMMENDATION
3-DESIGN OF PUMPS CONCRETE
PEDESTAL AND STEEL
BASEPLATE & ANCHORING BOLTS.
4-ENGINEERING OF I&C WORKS
INCLUDING P&ID REQUIRED FOR
WASTE WATER AND DEEP WELL
DISCHARGE TO MIXING POND,
MIXED WASTEWATER TO
RECHARGING WELLS AND THEIR
CORRESPODING CONTROL |
ORASCOM CONSTRUCTION INDUSTRIALS |
Egypt |
|
CHECKING PF ELECTRIC ENERGY METERS AND WATER DISCHARGE METERS FOR AL REHAB CITY (1,2) CITIES |
CHECKING OF ELECTRIC ENERGY
METERS AND WATER DISCHARGE
METERS FOR AL REHAB 1,2 CITIES |
2020 |
2020 |
0 |
Review of Installation Correctness
and Function for Electric Models -
Preparing list for Finally Meters |
AL REHAB CITIES AUTHORITY |
Egypt |
|
MADINATY STUDY AND RECOMMENDATION OF BEST PRACTICAL SOLUTION FOR THE EXISTING ROUTER |
REVIEW THE LOCATIONS OF
ANTENNAE FOR REPAIR AND
UPGRADE OF THE EXISTING
SOFTWARE AND REGARDING V1
TO IMPROVE THE COMMUNICATION
WITH THE MAIN SERVER IN
MADINATY BY USING “SUPERCOM “
OR UPGRADING EXISTING
SOFTWARE |
2019 |
2020 |
0 |
REVIEW OF DESIGN ,
EVALUATION |
TALAAT MOUSTAFA GROUP (TMG ) |
Egypt |
|
STUDY OF KHAZAN EL BAREEDS ELECTRICAL FOOD ALREHAB 1 |
ELECTRIC LOAD CALCULATION BY
TWO PHYSICAL METHODS DUE TO
FAILURE OF ONE IMPORTANT
ELECTRIC METER
HYDRAULIC CALCULATIONS FOR
POTABLE WATER CONSUMPTIONS
MEASURING METERS
CONSIDERING EFFICIENCY OF
RESPECTIVE PUMPS |
2020 |
2020 |
0 |
ARAB COMPANY FOR
PROJECTS AND URBAN
DEVELOPMENT |
ARAB COMPANY FOR PROJECTS AND URBAN DEVELOPMENT |
Egypt |
|
FEWA TENDER: 157– W2019 – D.I TRANSMISSION PIPELINES & ASSOCIATED WORKS IN UAQ |
HYDRAULIC STEADY STATE &
SURGE ANALYSIS AND ANALYSIS
OF PIPELINE PROFILE |
2020 |
2020 |
0 |
HYDRAULIC STUDY
OPERATION & CONTROL
PHILOSOPHY
STRUCTURAL DESIGNS |
M/S LINDENBERG WATER & DRAINAGE |
United Arab Emirates UAE |
|
Consultancy Services for Water Supply to Coastal Areas of Radeem, Harmiya and Shweihat (Consultancy Agreement No. D-106791. |
Consultancy Services for Construction of New Pipelines of Approximately 74 Km with All Associated Valves, Fittings, Flow Meters, Control Valves and Equipment for Smp and Bmu at The Coastal Areas of Radeem, Harmiya and Shweihat. |
2016 |
2020 |
6 |
Investigation, Studies , Design (Pdr), Detailed Design , Technical Submission for Tender Documents, Final Contractor s Tender Documents, Tendering, Evaluation , Awarding, -Construction Supervision, Field Supervision During Warranty Period |
Abu Dhabi Distribution Company |
United Arab Emirates UAE |
|
Assuit West Cc Power Plant – Waste Water Study Problem |
Assuit West Cc Power Plant 8x125 Mw Gt + 4hrsg+ 2x250 Mw St Troubleshooting And Root Cause Analysis To Enable Restart Of Operation Including Environmental Permit Requirements |
2019 |
2020 |
1500 |
Study Of Injection Of Water In Gas Turbine To Improve Flue Gas Quality, Studying Salinity Values Of Well Water (Current Source Establish Whether Brine Recirculation Occurs When Discharged To The Ground, Studying Of Maximizing The Use Of Waste Water To The Discharge To Nile Canal Within Acceptance Limits To Environment, Suitability Of Ponds As Waste Water Drain And Evaporation Limits, Reducing Un Wanted Discharge Pollutants |
Egyptian Electricity Holding Co. |
Egypt |
|
Design And Supervision Of 400 Kv Reactors |
Identifying the locations & installing (8)Nos 400kv shunt reactors and its associated equipment inside or in close proximity to 400kv SUR power station & 400kv IZKI grid stations. |
2015 |
2019 |
15 |
Basic design, Master Plan, Soil Investigation, Tender Document, Geo-Technical Report, Technical Report, Bid Evaluation, Commissioning, Site Supervision. |
Oman Electricity Transmission Company |
Sultanate Of Oman |
|
Consultancy Services For Design And Supervision Of Upgrading Bureimi Industrial To 220kv And Adding Third & Fourth 125 Mva Transformers 132/33kv, Adding Third & Fourth 125 Mva Transformers 132/33kv At Sfz And Upgrading Khaborah To 220kv |
Upgrading Bureimi to 220KV and adding third & forth 125MVA transformers 132/33KV, Adding third & Fourth 132/33KV 125 MVA transformers at Sohar Free Zone SFZ, Upgrading Khaborah to 220KV, Route survey and construction of LILO to the new proposed 220KV upgraded grid stations Bureimi industrial (from the double circuit OHTL between U.A.E & Mahdhah) and Khaborah (from the double circuit OHTL between SIS and MIS). |
2015 |
2019 |
100 |
Site Survey,Advisory Activity,Soil Investigation,Study Report,Basic Design,Master Plan,Design Report,Tender Document,Bid Evaluation,Construction Management & Supervision |
OETC |
Sultanate Of Oman |
|
Number of projects: 279
|