Sur Power and Desalination Plant |
4x35.4 MW ISO Rating Gas Turbine and 2 MIGPD desalination plant including sea water intake facilities. 4 MG water storage facility, blending, chemical conditioning, chlorination, civil works, pumping station with necessary piping system to join the plant with water system in Sur, and all necessary auxiliaries. |
1986 |
1986 |
65 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation (of nominated Tenderer by the Client), Post Contract duties including Supervision of Construction and Commissioning.
N.B.: The project activities have been with hold before preparation of Tender Document and after Engineering design which included submission of comparative study and outline design report which -in turn- have been discussed and approved with comments by the Client.
|
Water and Electricity Department, Abu Dhabi, End user: Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Ghubrah Power & Desalination Plant Unit Number 1 Retubing |
Replacement of Vesel Number 1 tube bundles for desalination unit number 1 |
1987 |
1987 |
4 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction & commissioning |
Ministry of Electricity & Water |
Sultanate Of Oman |
|
Investigation & Inspection Ghubrah Power & Desalination Plant Sea Water Intake & Outfall Phase I |
Mobilization & Demobilization, On-Shore Water Structure and Off-Shore Water Structure
|
1984 |
1987 |
1 |
Laboratory test results , Preliminary Report and Final Report including economical studies
|
Public Authority for Electricity and Water PAEW |
Sultanate Of Oman |
No Image
|
Umm Al-Nar West Power and Desalination Plant Extension, 7&8 Water Storage Tanks (Interconnection and Oxygenation) |
4x5 MIG water storage tanks, All related interconnecting piping (suction & delivery). |
1984 |
1987 |
7 |
Design, preparing Tender Documents, Tender Analysis, Post Contract Duties including supervision of construction and commissioning. |
Water and Electricity Department |
United Arab Emirates UAE |
|
Remote Areas R.O. Desalination Plants at Al-Wagon, Al-Koo and Umm Al-Zumul |
Three Reverse Osmosis Desalination Plants utilizing brackish water from wells at three sites, each site comprise 2 units, 100,000 IGD each |
1986 |
1987 |
10 |
Design, preparing Tender Documents, Tender analysis, Post Contract duties including Supervision of Construction and Commissioning. This project was canceled after the preparation of Tender Documents. |
Water and Electricity Department -Abu Dhabi |
United Arab Emirates UAE |
|
Ghubrah Desalination and Steam Raising Plant Extension, Phase II |
2 Nos. 5/6 MIGPD Desalination Plants each, 2 aux. boilers 220 tons/hr. each, sea water intake jetty & pipe trestles of about 600m in length, settling basin, outfall system, dist. water tank and civil & building works. |
1984 |
1987 |
100 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, commissioning and guarantee period. |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Umm al Nar East Gas Turbine Power & Desalination Plant Extension |
Two gas turbines for 87 MW ISO rating each and 3x6/7.2 MIGPD desal. plants, 2 Waste Heat Recovery Boilers of 210 tons/hr each & 2 natural gas and liquid fuel fired auxiliary boilers of 160 t/hr. each. |
1981 |
1987 |
214 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, Commissioning and guarantee period. |
Water and Electricity Department - Abu Dhabi |
United Arab Emirates UAE |
|
Umm Al Nar West Power & Desalination Plant Extension Units 7 & 8 |
2x160 MW extraction condensing type turbines, 2x625 tons/hr natural gas and liquid fuel fired reheat boilers at 126 bar and 510 C and 4x5/6 MIGPD desalination plant |
1981 |
1987 |
237 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including Supervision of Construction, Commissioning and. guarantee period. |
Water and Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Sea water cooling pumping plant Phase I and II - Shuaiba |
Phase I: 3x19500 m3/hr variable speed pumps + 5x18250 m3/hr fixed speed pumps + sea water chlorination plant + 11kv/380V substation + process computer and instrumentation system. Phase II: 4x10500 m3/hr variable speed pumps + 2x5MW diesel generators + 11KV substation.
|
1981 |
1988 |
90 |
Preliminary studies, Design of electrical, instrumentation and control systems pertaining to the work, preparation of Tender Documents, Tender Analysis, Post Contract duties including supervision of construction and commissioning. |
Shuaiba Area Authority, Kuwait |
Kuwait |
|
Shuaiba Sea Water Cooling Pumping Plant Emergency Diesel Generating Plant system for Kuwait National Petroleum Co. Mina Abdulla Refinary Kuwait |
2 x 5 MW 600 rpm diesel generating plant complete with MV switchgears for automatic change over from mains to emergency working of electric supply to 4 x 10500 m3/hr sea water cooling pumps, 11 KV/380 V. Substation, Instrumentation and Control Equipment, Civil and building works. |
1981 |
1988 |
5.6 |
Study, Design, Preparation of Tender Documents, Tender Analysis, Post Contract duties including Supervision of Construction, Commissioning and guarantee period. |
Shuaiba Area Authority, Kuwait |
Kuwait |
|
Number of projects: 279
|