Project Name
|
Description
|
|
|
|
Services Provided
|
Client
|
Country
|
Image
|
Umm Al Nar West Power & Desalination Plant Extension Units 7 & 8 |
2x160 MW extraction condensing type turbines, 2x625 tons/hr natural gas and liquid fuel fired reheat boilers at 126 bar and 510 C and 4x5/6 MIGPD desalination plant |
1981 |
1987 |
237 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including Supervision of Construction, Commissioning and. guarantee period. |
Water and Electricity Department, Abu Dhabi |
United Arab Emirates UAE |
|
Umm al Nar East Gas Turbine Power & Desalination Plant Extension |
Two gas turbines for 87 MW ISO rating each and 3x6/7.2 MIGPD desal. plants, 2 Waste Heat Recovery Boilers of 210 tons/hr each & 2 natural gas and liquid fuel fired auxiliary boilers of 160 t/hr. each. |
1981 |
1987 |
214 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction, Commissioning and guarantee period. |
Water and Electricity Department - Abu Dhabi |
United Arab Emirates UAE |
|
Marsa Alam Tourism Development Plan |
Feasibility Study and 20 Years Staging Plan for Marsa Alam Development (24 MIGD Desalination with 180MW Power Plant). The study included water and electricity distribution systems |
1996 |
1997 |
200 |
Preparation of Forecast Plan, Staging Plan and Feasibility Study for Dual Cycle & Single Cycle Plants including option for multi location or central location. Portion of RO30% of desalination capacity in dual cycle mode, & 100% in single cycle mode. The study included water and electricity distribution systems |
EMAK Co. for Utilities and Services,Cairo – Egypt |
Egypt |
|
Richards Bay Desalination Plant 100,000 M3/Day IPWP |
RO Desalination with Diesel power Plant 30 MW |
2010 |
2012 |
200 |
Design, Preparing tender document, Tender analysis, Post contract duties, including design review site supervision of construction and commissioning |
HKS Group |
South Africa |
|
Salalah Power System |
6x32.1 MW 1SO gas turbines, 132/33kv/11 kV facilities, Extension of the existing transmission and distribution systems, Modification of the existing transmission and distribution systems, Participation in the transfer of the existing power system to Dhofar Power Co. |
2001 |
2005 |
195 |
Supervision of the works including Privatization of Salalah Power System |
Dhofar Power Company , Sultanate of Oman |
Sultanate Of Oman |
|
Assuit Thermal Power Plant - 325 MW |
One 325 MW steam condensing turbine steam power plant and its associated dual fuel (Natural gas and fuel oil) power boiler(1085 t/hr) with auxiliaries and accessories. |
1988 |
1992 |
195 |
Post contract duties including supervision of construction and commissioning. |
Ministry of Electricity, Egyptian Electricity Authority. Egypt. |
Egypt |
|
Sur Centralized desalination plant |
20 MIGD new centralized declination plant and water supply scheme,RO/ME-TVC desalination plant,MV/LV switchgear, Automatic control system including DCS, PLC, SCADA & data transmission networks, Building and civil activities
|
2004 |
2005 |
187 |
Feasibility study and cost estimation for different operation of desalination process, preparation design report and tender documents, construction supervision. |
Ministry of Housing, Electricity and Water, MHEW - Sultanate of Oman |
Sultanate Of Oman |
|
Ben Ban Electrical Transmission (Solar Project) |
Transmission of The Solar Electric Power from The Solar Plots (39 Plots with Total Power of 1850 Mw) At Benban Area – Aswan – Upper Egypt Electricity Area to Their Located Step Up Substations (4 Nos) 22/22/220 Kv to Be Connected to The National Grid (220 Kv Level) At The Same Area. By Using Underground Cables, 18/30 Xpls Inside Trenches from The Solar Plots to The (4 Nos) Substations. |
2016 |
2016 |
181 |
Technical Study for The Suitable Cross Section of Underground Cables to Be Used for Transmitting Generated Power (About 1850 Mw) Laid in Trenches with Size and Type Suitable for Power to Be Transmitted, Conceptual & Detailed Mv Cables/ Fo Cables Routing Layout from Each Solar Plot Up to The 22/22/220 Kv Step-Up Hv Substation, Coordinating with The Civil Engineering Works. |
EGEMAC - Egyptian German Electricity Manufacturing Company |
Egypt |
|
Ghubrah Power and Desalination Plant Extension Phase-III |
1x30 MW Power (Back pressure extraction steam turbine with dump condenser) 1x230 t/hr H.P boiler, 1x 5/6 MIGPD desalination unit complete with auxiliaries, anciliaries, sea water intake and Civil Works |
1988 |
1993 |
177 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction, commissioning and guarantee period. |
Ministry of Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Desalination plant at Hong Kong |
plant capacity 144.200 M3/D,6 TVC designate units 3 Aux. Boiler of 210 T/hr each at 20 bar 2 HRSG OF 24 T/hr each at 20 bar 2 gas turbine of 10 MW each |
2001 |
2001 |
170 |
Preparation of preliminary design report |
water supply department – government of Hong Kong |
Hong Kong |
|
Number of projects: 279
|