Project Name Description
Start Year
Finish year
Cost X106
Services Provided Client Country Image
Smart Water Network for Madinaty Project Phase I: Data Transfer To Consortium To Prepare The Hydraulic Study For All Madinaty Phases . -Detailed Engineering Of The System Including Scada System For Automatic Control, Prepare BOQ Of Main Equipment Phase Ii : Preparing Planning Program Of Installation Of Equipment, Follow Up Installation, Testing, Of All Equipment Till Taking Over The Project. 2015 2018 14 Data Collection, Hydraulic Studies (Steady State, Un-Steady State), Review Of Current Specification, Site Supervision, Testing, Commissioning Till The Taking Over Of Project, Engineering By Consortium, Review Of BOQ, Arab Company for Projects and Urban Development Egypt
CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS. CONSULTANCY SERVICES FOR DESIGN AND SUPERVISION OF INSTALLATION OF THIRD 500MVA TRANSFORMER AT AIRPORT HEIGHTS AND NEW 132KV UG CABLE CKT BETWEEN AIRPORT HEIGHTS GS AND GHALA GS. 2019 2023 15 DESIGN REPORT – DRAWINGS - PRICE LIST – B.O.Q - ENGINEERING WORKS – SITE SUPERVISION OMAN ELECTRICITY TRANSMISSION CO. Sultanate Of Oman
Repair and Refurbishment of Civil Works for Power Stations & Desalination Plants Refurbishment and repair of concrete and reinforced concrete mainly for distiller and turbine foundations, auxiliaries and ancillary concrete building structures deteriorated steel structural supports and damaged drain pipes,etc. 1999 2001 15 Preparation of Tender Documents, Bids Evaluation and Construction Supervision Water and Electricity Department, Abu Dhabi, UAE United Arab Emirates UAE
Relocation of Desalination Units from Mirfa to Dalma Relocation of 2x1 MIGD TVC desalination units from Mirfa to Dalma 2003 2005 15 Preparation of Tender Documents, Bids Evaluation, site supervision including guarantee period. Water and Electricity Department, Abu Dhabi, UAE. United Arab Emirates UAE
Saadiyat Desalination Plant 480,000 IGPD Desalination Plant 1974 1975 15 Feasibility Study, Engineering Design, Preparation of Tender Documents and Bids Evaluation Water and Electricity Department, Abu Dhabi United Arab Emirates UAE
Design And Supervision Of 400 Kv Reactors Identifying the locations & installing (8)Nos 400kv shunt reactors and its associated equipment inside or in close proximity to 400kv SUR power station & 400kv IZKI grid stations. 2015 2019 15 Basic design, Master Plan, Soil Investigation, Tender Document, Geo-Technical Report, Technical Report, Bid Evaluation, Commissioning, Site Supervision. Oman Electricity Transmission Company Sultanate Of Oman
Epc For Construction Of New Power Station At Hallaniyat Island In Dhofar Governorate And Interlink Works Between New Power Station And Existing Distribution Network 4 DIESEL UNITS X 1000KW 0.415KV – 2 DIESEL UNITS X 500KW 0.415KV – 4 STEP-UP 2013 2017 15 Assistance to Prepare Contract,Attending Manufactures Tests,Bid Evaluation,Concept Design,Construction Management & Supervision,Soil Investigation,Project Management,Study Report Rural Areas Electricity Co. Sultanate Of Oman
Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02 Consultancy Services for Replacement of Existing Water Distribution Network in Abu Dhabi Island for Sectors E9_02, E10, E13 & W14_02. The Anticipated Quantity of Pipelines to Be Replaced Is Approximately 39km with All Associated Civil Works 2013 2018 16 Study Report, Site Survey, Design Report, Tender Document, Bid Evaluation, Evaluation Report, Site Supervision Abu Dhabi Distribution Company United Arab Emirates UAE
TCI Extension for Lang Building. Built up an extension for the TCI building to the north by 12m x 18m for 3 floors 2003 2003 18 Structural design for the building extension structure Producing all the detailed drawings specifications and Tender Documents: - Conducting the site survey for the existing new mixing building. - Structural calculations for the New Extension for the Mixing Building and check the stability of the existing TCI building. - Producing all the detailed drawings for concrete strap beams foundation and structure steel. - Production of the Tender Documents and Technical Specification Proctor & Gamble Egypt
Reinforcement of Dhahirah Region 132 kV Transmission System 145 km of 132 kv OHTL.413 km of 33 kv OHTL.Extensions to four major substations.Relocation of 132/33 kv transformers 1994 1997 18 Engineering Design, Preparation of Tender Documents & Bids Evaluation. Ministry of Electricity and Water, Sultanate of Oman Sultanate Of Oman
Number of projects: 279