Construction of diesel power station at Saih Al- Kirat, Dofar |
All civil works for the construction of power station,Relocation of 8x1000 KM diesel generating units from Sur to Saih Al-Kirat
|
2004 |
2006 |
1 |
Preparation of tender documents, bids analysis and supervision of construction and erection. |
Ministry of Hosing, Electricity and Water, Sultanate of Oman |
Sultanate Of Oman |
|
Marsa Alam Diesel Power Station |
4 x 3 MW Site rating diesel generating units operating with light and heavy fuel oil complete with all electrical, instrumentation, civil and building works.The plant is designed to be extendable up to 3 x 8 + 2 x 8MW diesel generating units |
1999 |
2001 |
12 |
Study, Design, Preparation of Tender Documents, Bids Analysis and Pre-Contract negotiations. |
EMAK for Utilities and Services, Cairo Egypt |
Egypt |
|
Shuaiba Sea Water Cooling Pumping Plant Emergency Diesel Generating Plant system for Kuwait National Petroleum Co. Mina Abdulla Refinary Kuwait |
2 x 5 MW 600 rpm diesel generating plant complete with MV switchgears for automatic change over from mains to emergency working of electric supply to 4 x 10500 m3/hr sea water cooling pumps, 11 KV/380 V. Substation, Instrumentation and Control Equipment, Civil and building works. |
1981 |
1988 |
5.6 |
Study, Design, Preparation of Tender Documents, Tender Analysis, Post Contract duties including Supervision of Construction, Commissioning and guarantee period. |
Shuaiba Area Authority, Kuwait |
Kuwait |
|
Diesel Power Station, Nos. 7,8 and 9 Al-Ain |
3x3.75 MW Diesel Power Station running on crude oil |
1971 |
1973 |
2.5 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Al Ain Power Station Extension Phase II |
1 x 3.75 MW Diesel Power Station running on crude oil |
1972 |
1974 |
1.2 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Diesel Power Station and Water Desal. Plant Saadiyat Island |
2x3.8 MW Diesel Power Station running on crude oil |
1973 |
1975 |
7 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Water and Electricity Department, Abu Dhabi. |
United Arab Emirates UAE |
|
Midelec Power Station to Supply Midor Refinery with Power |
2x5 MW standby diesel Engines for MIDELEC power station |
1999 |
2001 |
10 |
Preparation of IPP Contract, Post Contract duties including Supervision of Construction, and Commissioning guarantee period |
Middle East Electricity Co. (MIDELEC) |
Egypt |
|
Salalah Power System |
6x32.1 MW 1SO gas turbines, 132/33kv/11 kV facilities, Extension of the existing transmission and distribution systems, Modification of the existing transmission and distribution systems, Participation in the transfer of the existing power system to Dhofar Power Co. |
2001 |
2005 |
195 |
Supervision of the works including Privatization of Salalah Power System |
Dhofar Power Company , Sultanate of Oman |
Sultanate Of Oman |
|
Al Kamil Power Plant |
3x123MW ISO GE frame 9E gas turbines, 2x600m3 fuel oil tanks, All associated electro-mechanical works, All associated civil works, The project is BOO Basis. |
2001 |
2003 |
120 |
Detailed Design for Mechanical, Civil, Electrical, I&C, Gas turbine foundation design and interfaces, Sub-vendor and subcontractor nomination and evaluation, Amendments due to site changes, troubleshooting during construction. |
Al-Kamil Power Company |
Sultanate Of Oman |
|
Wadi Al-Jizzi Power Plant Extensions (Units 9&10) |
Two extensions (units 9 and 10) each of 38.5 MW ISO rating gas turbines with all ancillaries and auxiliaries and civil and building works |
1991 |
1994 |
28 |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of Construction and commissioning. |
Ministry of Electricity and Water, Sultanate of Oman. |
Sultanate Of Oman |
|
Number of projects: 279
|