English | العربي
Consultancy services for soil settlement investigation at al taweelah B plant
Description: Sea water pumping station, distiller unit and power unit foundation, pipe rack settlement of fills & soil movement for civil structure/pipes for data collection, samples collection, measurements, analysis of samples and measurements, results analysis, technical recommendations, design & specification preparation for remedial works in determined locations at altaweelah site
Start Date: 2013
Complation Date: 2014
Cost: 1500 million US $
Services Provided: studying different possible causes of movement and distress, data collection, site survey and site investigation, technical assessment
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved