New Mixing Packing Building Design Review |
|
Description: |
Design review for the structure calculation and detailed drawing for the new mixing and packing building |
Start Date: |
2000 |
Complation Date: |
2001 |
Cost: |
3 million US $ |
Services Provided: |
Review structural steel design for new mixing building and the packing building.
- Check the design parameters with the Egyptian code.
- Check and approval the detailed drawings.
-Carry out cross check for the design by built up 4 computer models on longitudinal and transversal frames to check results of the design.
|