English | العربي
HSP Project
Description: Build up an Extension for the Existing conveyors and Tank farm
Start Date: 1999
Complation Date: 1999
Cost: 2 million US $
Services Provided: - Structural design for the carrying system and modifications for the steel structure - Structural design of the tank farm extension. - Producing all the detailed engineering steel and concrete drawings
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved