132 kV Overhead Transmission Line, Ghubrah - Madinat Qaboos-Oman |
|
Description: |
Double circuit designed, single circuit equipped, 300 MVA capacity, including two 1650 Amp GIS circuit breakers and power line carrier equipment |
Start Date: |
1992 |
Complation Date: |
1995 |
Cost: |
8 million US $ |
Services Provided: |
Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including supervision of construction and commissioning. |
|
|