English | العربي
Hurghada and Sharm El-Sheikh Power and Desalination Plants
Description: Two plants at Hurghada and Sharm El-Sheikh each comprising of:2x300 m3/day vapour compression desalination units,3x1.2 MW diesel generating sets.
Start Date: 1990
Complation Date: 1991
Cost: 6 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties (later changed to R.O. plant - see E.3).
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved