English | العربي
Sea Water Distillation and Power Generating Plant, Las Palmas Grand Canaria
Description: 2x20 MW back pressure steam turbine power and 20000 M3/day desalination plant.
Start Date: 1966
Complation Date: 1969
Cost: 10 million US $
Services Provided: Engineering Design, Preparation of Tender Documents, Bids Evaluation, Post Contract duties including Supervision of Construction and Commissioning.
Home   |   Site map    |   Contact us    |   Privacy policy
  Copyright © 2009 CEC. All rights reserved